Heavy Lift / Offshore Construction

PROJECT TITLE

Transportation and Installation of Delta South Substructures and Topsides (Deck, Living quarter, helideck and bridge)

CLIENT

Chevron Nigeria Limited

SCOPE / DESCRIPTION OF THE PROJECT

Delta South Project consisted of the installation engineering, project management, load-out of fabricated structures, and installation of Jacket (150mT), Piles, decks, living quarter (675mT), helideck and bridge at Delta South field.

YEAR OF EXECUTION

2013 – 2014